GMT(Glass Fiber Mat Reinforced Thermoplastics) mold is a mold process which developed to replace existing steel parts with GMT parts in order to reduce the price and light the weight of passenger cars and commercial vehicles.
The typical products are Back Beam of passenger car, Sheet Back of chair and Under Cover of engine.
Putting the material into the mold after heated to about 170 ℃. Then, it is compressed by press machine to make the shape.
As a merit, it is possible to insert glass mat or honeycomb sheet woven with resin such as P.P., so that high-rigidity functional parts can be produced at a low cost due to simplification of the process. ![]() |
|---|
| Part name |
Engine Under Cover | Part Material |
GMT |
|---|---|---|---|
| Method | Compression Mold | Mold Material |
KP-4 |
| Machine | Press 1,000 ton | Lead- time |
30 ~ 50 days |
| Note | |||
![]() |
|---|
| Part name |
Back Beam | Part Material |
PP + GF |
|---|---|---|---|
| Method | Compression Mold | Mold Material |
KP-4 |
| Machine | Press 500 ton | Lead- time |
30 ~ 50 days |
| Note | |||
![]() |
|---|
| Part name |
Seat Back | Part Material |
GMT |
|---|---|---|---|
| Method | Compression Mold | Mold Material |
KP-4 |
| Machine | Press 500 ton | Lead- time |
35 ~ 70 days |
| Note | |||
![]() |
|---|
| Part name |
Battery Tray | Part Material |
GMT |
|---|---|---|---|
| Method | Compression Mold | Mold Material |
KP-4M(P-20) |
| Machine | Press 1,000 ton | Lead- time |
45 ~ 90 days |
| Note | |||
![]() |
|---|
| Part name |
Fem Carrier | Part Material |
GMT |
|---|---|---|---|
| Method | Compression Mold | Mold Material |
KP-4 |
| Machine | Press 1,500 ton | Lead- time |
60 ~ 90 days |
| Note | |||
![]() |
|---|
| Part name |
Spare Tire Well | Part Material |
GMT |
|---|---|---|---|
| Method | Compression Mold | Mold Material |
KP-4 |
| Machine | Press 2,000 ton | Lead- time |
60 ~ 80 days |
| Note | |||
![]() |
|---|
| Part name |
Electric Battery Case | Part Material |
GMT / SMC |
|---|---|---|---|
| Method | Compression Mold | Mold Material |
KP-4 |
| Machine | Press 2,000 ton | Lead- time |
60 ~ 90 days |
| Note | |||
![]() |
|---|
| Part name |
Engine Cover | Part Material |
GMT |
|---|---|---|---|
| Method | Compression Mold | Mold Material |
KP-1 |
| Machine | Press 500 ton | Lead- time |
30 ~ 50 days |
| Note | |||
Company Name : DONG-A ENG Co., Ltd. Address : 46, Emtibeui 25-ro 20beon-gil, Siheung-si, Gyeonggi-do, South Korea
TEL : 031-492-5237 FAX : 031-492-5251 Email : sales@dongaeng.co.kr
COPYRIGHT(C) 2020 DONG-A ENG CO., LTD. ALL RIGHTS RESERVED.